Owner: San Antonio Water System 

This project entailed the comprehensive rehabilitation of approximately 800 linear feet of the existing 30-inch force main, coupled with the strategic installation of an additional 800 linear feet of parallel 30-inch force main to enhance system redundancy and capacity. Additionally, the scope includes the meticulous restoration of approximately 330 linear feet of the 42-inch sewer main, alongside critical upgrades to the Acequia Lift Station, aimed at optimizing operational efficiency and ensuring long-term infrastructure resilience.